Starting October 6th
Notice of temporary trail closure of “Intemann Trail” in Red Rock Open Space. This closure is for maintenance on retaining walls between “Waterfall Trail” and “Section 16 Connector Trail”. This trail section will be unavailable for use for an expected period of one week and will be in affect from 7am to 3pm daily. Public access will be permitted over the weekend, resuming the following week until completion.
Volunteers with Rocky Mountain Field Institute will be performing these much needed repairs. Please referred to the map for the work site location (red line) and a suggested detour (orange line). The detour is roughly 3.3 miles.
Thank you for patience and flexibility during this period!
